Dewatering of streams with suspended solids - for example sludge of biological systems - can easily be carried out with decanters. Logisticon has specialized themselves in constructing mobile decanter systems. Below special references are shown.

Containerized decanter on top of frame with sludge transport system

The container with decanter is placed on a construction to be able to transport the sludge that falls out of the decanter to two or more waste containers. The entrance to the container is by stairs with platform on height. 

  • Dewatering - Decanter system on frame with sludge transport screw - 1
  • Dewatering - Decanter system on frame with sludge transport screw - 2
  • Dewatering - Decanter system on frame with sludge transport screw - 3
  • Dewatering - Decanter system on frame with sludge transport screw - 4
  • Dewatering - Decanter system on frame with sludge transport screw - 5

Large decanter with PE dosing system 

A large decanter is placed within a 40ft container. A large automatic Poly Electrolyte (PE) dosing system is included. This container is also foreseen with air conditioning. For maintenance purposes the container features lifting gear to be able to remove the rotor from the decanter. 

  • Dewatering - Large Decanter with PE dosing system - 1
  • Dewatering - Large Decanter with PE dosing system - 2
  • Dewatering - Large Decanter with PE dosing system - 3
  • Dewatering - Large Decanter with PE dosing system - 4
  • Dewatering - Large Decanter with PE dosing system - 5

Containerized decanter - very complete system with PE dosing system 

Container with decanter and PE dosing system and all extras needed to get a good working area. Washing sink, work bench, garden hose and so on - all needed for optimal operation and maintenance of the decanter.

  • Dewatering - Complete decanter installation with PE dosing system - 1
  • Dewatering - Complete decanter installation with PE dosing system - 2
  • Dewatering - Complete decanter installation with PE dosing system - 3
  • Dewatering - Complete decanter installation with PE dosing system - 4
  • Dewatering - Complete decanter installation with PE dosing system - 5